I-15 Exit 144 through Cove Fort
OPENDry · Fair
No listed restriction.
Thursday, May 14, 2026 · Escalante, Utah · A field guide to canyon country
UDOT paved-road data
A live paved-road view for Highway 12, US-89, and nearby state-road approaches. UDOT covers state-maintained road infrastructure; dirt-road decisions still belong with BLM, county, NPS, Forest Service, weather, and visitor-center sources.
Related planning links
UDOT is the right source for paved-road infrastructure. For Monument dirt roads, use the BLM road report, road-source pages, visitor center, and weather context.
Google hybrid satellite base
Google Maps key needed
Set NEXT_PUBLIC_GOOGLE_MAPS_API_KEY in Vercel to load the Google hybrid satellite base.
Open Google MapsDry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
Dry · Fair
No listed restriction.
roadwork · Unknown · MP MP 51
ALERT: t. Traffic Signals are in place on Old Highway 91 and the Interstate off-ramps. Signals are set to flash yellow to remind drivers to yield as they enter the construction zone. Crews are working beneath the Hamilton Fort Bridge installing storm drain systems and preparing to build the new roundabout. BACKGROUND: This project is building an additional lane on I-15, and making improvements to the Exit 51 interchange. Contact the project team: 435-254-3305, i15hamiltonfort@utah.gov, udotinput.utah.gov/i15hamiltonfort. R4.18224
roadwork · Unknown · MP MP 53-MP 56
ALERT: Crews are working near MP 51.5-53 near the road shoulder removing dirt to prepare for the new lane. Crews will also work in the road shoulders near milepost 47 to pave a section of the new passing lane. BACKGROUND: This project is building an additional lane on I-15 between milepost 43 and 56, and making improvements to the Exit 51 interchange. There are multiple active work zones in the project area. For more info, contact the project team: 435-254-3305, i15hamiltonfort@utah.gov, udotinput.utah.gov/i15hamiltonfort. R4.18224
roadwork · Unknown · MP MP 31-MP 60
Project will begin Monday, Jan. 12 with an estimated completion date of Friday, May 21. The contractors will be making drainage and infrastructure improvements. Expect shoulder closures from north of Pintura to north Cedar City. Project will begin in the northbound direction. R4. 22119 The construction will take place only during night hours from 10:00 pm to 7:00 am.
roadwork · Unknown · MP MP 9-MP 43
Our crews will complete lane leveling preparing for chip seal project in June. WORK TO BEGIN Monday May 18 and will run for 3 days. Daytime work only. ALTERNATING TRAFFIC with wait times of up to 15 minutes. Work times 7:00 am to 7:00 pm R4. 22445
roadwork · Unknown · MP MP 82
Our crews will be replace the pipe culverts and paving under I-15 at this location.. SOUTHBOUND LANES at Exit 82 will be used for DETOUR OFF I-15 and back ON to I-15 for 2 days. WORK CLOSURE TO BEGIN Sunday May 17 from approximately 8:00 pm to 8:00 am. and Monday May 18 from 8:00 pm to 8:00 am All lanes on I-15 at this location will be open during daylight hours. R4. 22118
roadwork · Unknown · MP MP 82
Our crews will be replace the pipe culverts and paving under I-15 at this location.. NORTHBOUND LANES at Exit 82 will be used for DETOUR OFF I-15 and back ON to I-15 for 2 days. WORK CLOSURE TO BEGIN Tuesday May 9 from approximately 8:00 pm to 8:00 am. and Wednesday May 20 from 8:00 pm to 8:00 am on Thursday May 21. All lanes on I-15 at this location will be open during daylight hours. R4. 22118
SR 130 · Northbound
Enabled
Open UDOT cameraI-15 · Northbound
Enabled
Open UDOT cameraSR 12 · Unknown
Enabled
Open UDOT cameraSR 62 · Southbound
Enabled
Open UDOT cameraI-15 · Southbound
Enabled
Open UDOT cameraSR 59 · Southbound
Enabled
Open UDOT cameraSR 14 · Unknown
Enabled
Open UDOT cameraSR 143 · Southbound
Enabled
Open UDOT camera74.51F air · Dry
88F surface · S 15.90 mph, gusting 30.03 mph
UDOT weather station.
81.30F air · Dry
110.5F surface · S 17.38 mph, gusting 34.20 mph
76.69F air · Dry
98.6F surface · SW 14.51 mph, gusting 31.13 mph
53.45F air
SW 13.65 mph, gusting 24.96 mph
70.50F air · Dry
83.5F surface · W 17.21 mph, gusting 30.91 mph
74.79F air · Dry
86.7F surface · W 15.96 mph, gusting 29.15 mph
75.69F air · Dry
86.4F surface · SW 21.74 mph, gusting 36.83 mph
I-15 Exit 144 through Cove Fort · 6180 ft
Dry · 74F air · 15 mph, gusting 31 mph
I-15 Exit 144 through Cove Fort · 6610 ft
Dry · 74F air · 14 mph, gusting 32 mph
I-15 Exit 120 through Beaver to Exit 95 · 6500 ft
Dry · 76F air · 15 mph, gusting 31 mph
I-15 Iron/Washington Co Ln to Anderson Jct · 4825 ft
Dry · 83F air · 20 mph, gusting 34 mph
I-70 I-15 Jct at Cove Fort to Clear Ck Summit · 7180 ft
69F air · 14 mph, gusting 27 mph
SR-130 over Minersville Pass · 6570 ft
Dry · 74F air · 21 mph, gusting 33 mph
SR-143 Parowan to Brian Head · 10620 ft
53F air · 18 mph, gusting 32 mph
SR-12 Bryce Canyon to Torrey · 9600 ft
Dry · 62F air · 32 mph, gusting 44 mph
SR-14 · Eastbound
NO_MESSAGE
SR-9 · Eastbound
NO_MESSAGE
I-70 · Eastbound
NO_MESSAGE
I-70 · Westbound
NO_MESSAGE
SR-14 · Westbound
NO_MESSAGE
SR-143 · Southbound
NO_MESSAGE
I-15 · Northbound
NO_MESSAGE
I-70 · Eastbound
NO_MESSAGE